2015 Annual Conference & Exhibit

AC15_Session16_BWeiner - Tertiary Treatment Upgrade using Ballasted Flocculation for Zinc and Phosphorus Removal in Smithfield, RI—A First in Rhode Island, Pilot and Fullscale operation – Bryan Weiner, Wright-Pierce David Bowen, Wright-Pierce Kevin Cleary, Town of Smithfield, RI

AC15_Session16_MNeville - Optimizing the A2/O Process to Push the Limit of Technology at Upper Blackstone – Maureen Neville, CDM Smith Karla Sangrey, Upper Blackstone WPAD

AC15_Session16_SGuswa - Meeting North Attleborough, MA’s 0.1 mg/L Phosphorus Limit with Bio-P and Cloth Media Filters—From Pilot Testing through the First Year of Operation – Susan Guswa, Tighe & Bond Merrill Hastings, Town of North Attleborough, MA

AC15_Session17_KBiedron - Implementation of SSES Recommendations and SSES Pilot Study Program – Katelyn Biedron, CDM Smith Jason Waterbury, The MDC John Harper, CDM Smith

AC15_Session17_PBrinkman - I/I Removal—Cost or Benefit – Paul Brinkman, Wright-Pierce

AC15_Session18_JMurphy - Development and Implementation of an Industrial Facility Stormwater Pollution Progam in New England – John Murphy, Stantec

AC15_Session18_VReis - One RDA—Two Approaches – Vonnie Reis, Town of Milford, MA Robert “Brutus” Cantoreggi, Town of Franklin, MA

AC15_Session19_GJohnson - Use of Dynamic Process Control at a Long Island Sound Water Pollution Control Facility Significantly Reduces Supplemental Carbon Use While Maintaining Nitrogen Removal Permit Compliance – Gary Johnson, Consultant Mark Rode, General Control Systems Peter Stallings, Town of Stratford, CT

AC15_Session19_JIrving - Advances in On-line Instrumentation and Enhanced Wastewater Process Control – Justin Irving, Hazen and Sawyer

AC15_Session19_KWiklund - Instrumentation and Methods for Monitoring and Process Control of the Biological Nutrient Removal System at the North Attleborough, MA WWTF – Daniel Roop, Tighe & Bond Kaela Wiklund, Town of North Attleborough, MA